Explore equipment by the job it performs. Build a comparison around container preparation, filling, closing and downstream handling rather than a long list of unrelated machines.
- Which process step is limiting your current production?
- What interfaces must a replacement machine share with your existing equipment?
Find the equipment for the missing process step
Begin with the operation you need to add or replace: rinsing, filling, closing or downstream packaging. Keep required container and product information in the search brief. A broad catalogue is useful when the process question is clear.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.